Miraflores · Okafor-Lindqvist 2025
⏱
🔔
For Priya Raman
Nothing needs you.
F8949.D.M9 · federal · F8949 line D.M9

Northgate Rail Corp (acquired 2020-01-10, sold 2025-06-24; proceeds 5,520.00, basis 4,880.00)

640
engine v3
not yet verified

How this number was built

R-8949-LOT One line per sale: proceeds minus basis plus adjustment. Broker basis is used as reported unless a supplemental statement for the same lot is matched.
Sources (6) — where the inputs came from
Meridian Brokerage 2025 consolidated Form 1099 - CORRECTED (joint)
D31 · page 6 · field M9_description · “Lot M9 description”
read as “Northgate Rail Corp” → Northgate Rail Corp 99%
Meridian Brokerage 2025 consolidated Form 1099 - CORRECTED (joint)
D31 · page 6 · field M9_acquired · “Lot M9 date acquired”
read as “01/10/2020” → 2020-01-10 99%
Meridian Brokerage 2025 consolidated Form 1099 - CORRECTED (joint)
D31 · page 6 · field M9_sold · “Lot M9 date sold”
read as “06/24/2025” → 2025-06-24 99%
Meridian Brokerage 2025 consolidated Form 1099 - CORRECTED (joint)
D31 · page 6 · field M9_proceeds · “Lot M9 proceeds”
read as “5,520.00” → 5,520 99%
Meridian Brokerage 2025 consolidated Form 1099 - CORRECTED (joint)
D31 · page 6 · field M9_basis · “Lot M9 cost basis”
read as “4,880.00” → 4,880 99%
Meridian Brokerage 2025 consolidated Form 1099 - CORRECTED (joint)
D31 · page 6 · field M9_wash · “Lot M9 wash sale loss disallowed”
read as “0.00” → 0 99%
Flows into

History — nothing is overwritten

v1 · 2026-03-04: -1,380v2 · 2026-03-19: 640v3 · 2026-06-23: 640
Adjust this number
Reviewer approves; over 1,000 tax effect needs the partner.

Evidence & discussion

Record how you verified it